PT. STANIA BARA CONSULTING

We Create Value as a Competent Mining Consultant

Partners


CAE mining is at the forefront of the industry in developing and providing innovative technology and services to plan, manage and optimise mining operations. With operations in nine countries, CAE Mining offers enhanced solutions ranging from exploration data management and ore-body modelling, to mine planning and operations management...

Read more



We have already held many course for data processing at Jakarta or other places on Mining Company and Goverment such as:

Training Datamine NPV Scheuduler 4 in 2014:

  • Sept, 24-24, 2014 NPV Scheuduler 4. PT. Asari Tambang for Long term Schueduling Using Scheduler4
  • April, 3-4, 2014 (CAE Mining) Datamine Studio3 for Conditional Simulator Using CAE Mining Studio3

Training Datamine (CAE Mining) STUDIO3 and STRAT3D in 2013:

    • Desember 16, 2013 (CAE Mining) Datamine T raining   Studio3   Personal/Privat   for   Geological Modeling   and   Block   Model.
    • Desember 12, 2013 (CAE Mining) Datamine T raining   Studio3   PT .   Harita Nikel Group   for   Conditional Simulation.
    • October 02 - 03, 2013  (CAE Mining) Datamine T raining   Studio3   PT .   Forty   Resources   for   Geological Modeling   and   Block   Model.
    • September 09 - 17, 2013 CAE Mining (Datamine) Training Studio3 PT. Pama Persada for Foundation of Geological Modeling, Statistic-Geostatistic, and Mine Design.
    • September 04 -05, 2013 CAE Mining (Datamine) Training STRAT3D PT. Padang Anugrah, PT. Prima Raya Indobara for Geological Modeling, Grade Estimation and Evaluat.
    • August 15 - 16, 2013 CAE Mining (Datamine) Training STRAT3D PT. Carsurin for Geological Modeling, Grade Estimation and Evaluation.
    • Juni 19-26,2013 (CAE Mining) Datamine Training MSO PT. ANTAM Tbk. Pusat , Training MSO-Introductory, Development MSO-Advanced, Training MSO-Advanced.
    • May 29 - 31, 2013   (CAE Mining) Datamine T raining   Studio3  PT. Jresorces Bolaang Mongondow  for NPV Scheduler.
    • April 15 - 16, 2013  (CAE Mining) Datamine T raining   Studio3  PT. PT. Lion Power energy  for  Geological  Modeling.
    • April 15 - 18, 2013  (CAE Mining) Datamine T raining   Studio3  PT. Jresorces Bolaang Mongondow  for  Geological  Modeling  and  Block  Model.
    • February 11 - 12 and 18 - 19, 2013   (CAE Mining) Datamine T raining   Studio3  PT. Semen Padang  for  Geological  Modeling  and  Block  Model

     

    The following are previous studio3 training Datamine:

    In 2012

    • Introduction to Datamine Training for PT. Jresources, Jakarta

    • Introduction to Datamine Training for PT. SRK Indonesia, Jakarta

    • KCMI Code (Indonesian JORC Code) and Implemention on Save Coal Indonesia Seminar, PERHAPI, Jakarta
    • KCMI Code (Indonesian JORC Code) Workshop, PERHAPI-IAGI, Jakarta
    • Introduction to Datamine, at PPTM, Bandung

    In 2011

    • One Day Seminar, “Working With JORC Code for Coal Industry” February 10, Hotel Bumi Senyiur, Samarinda, East Kalimantan
    • “Reporting of Coal Exploration, Resource and Reserve Based On KCMI Code (Indonesian JORC Code)”, Perhapi (Association of Indonesia Mining Professionals), March 23 Hotel Sultan Jakarta
    • One Day Seminar, “Working With JORC Code for Coal Industry” November , Hotel Bumi Senyiur, Samarinda, East Kalimantan

    In 2010

    • Open Pit Design, Mining Engineering Department ITB
    • Introduction to Datamine, Public Training
    • Geostatistic and Geological Modeling Public Training

    In 2009

    • Introduction to Datamine, Mining Engineering Department, ITB
    • Introduction to Datamine, PT. ANTAM, Tbk
    • Datamine Mini Conference at Hotel Mulia, Jakarta
    • JORC Code and Applied Resource Estimation, at PT Stania Bara Consulting
    • Technical Assistance, Review & Improvement for Nickel Resource Modeling (Data Processing) Procedure at Unit Geomin – PT. ANTAM, Tbk
    • Coal Modeling Course, Held for Mine Valuator Purpose, at PPTM, Bandung
    In 2008
    • Basic Scheduling PT. ANTAM Tbk – UBPE Pongkor
    • Advance 1 – Set Up Production Scheduling, PT ANTAM Tbk, - UBPE Pongkor
    • Advance 2 – Adjustment Production Scheduling, PT. ANTAM Tbk, - UBPE Pongkor
    • Advance 3 – Reconciliation and Evaluation, PT ANTAM Tbk, - UBPE Pongkor
    • On Job Training Geological Modeling and Mine Design, PT ANTAM Tbk Pomalaa and Tapunopaka
    • Ore Modeling, Geostatistic, Mine Design PT. Yudistira Bumi Bhakti (YBB)
    • Ore Modeling, Geostatistic, Mine Design PT. Pamapersada Nusantara (PAMA)
    • Ore Modeling PT. Nusa Palapa Mineral (Sumatra Copper and Gold)
    • Workshop “Resources & Reserve Estimation Base on JORC and Underground Study Case”, Institute Technology Bandung (ITB)
    • Introduction to Datamine, PT Adiratna Bani Makmur
    • Ore Modeling Course, Held for Mine Valuator Purpose, at PPTM, Bandung
    • Reporting of Resource and Reserve Based on JORC Code, Held for Mine Valuator Purpose at PPTM, Bandung
    • Quarry Reserve Modeling Introduction, PT Semen Padang

    In 2007

    • Geological Modeling PT. ANTAM, Tbk – Unit Geomin
    • Coal Modeling PT. Tanjung Alam Jaya (TAJ)
    • Nickel Geological Modeling (Advance), PT. ANTAM, Tbk – Unit Geomin
    • Nickel Statistic / Geostatistic, PT. ANTAM, Tbk – Pomalaa
    • Geological Modeling for Ahli Tambang Madya PT. ANTAM, Tbk
    • Mine Design for Ahli Tambang Madya PT. ANTAM, Tbk
    • Introduction to Datamine PT ANTAM, Tbk – UBPE Pongkor
    • Block Modeling Course PT. ANTAM, Tbk – UBPE Pongkor
    • Quarry Reserve Modeling PT. Semen Gresik Tbk(Persero)
    • Workshop Modeling Exploration Database, PT ANTAM Tbk – Unit Geomin and UBPE Pongkor
    • Introduction to Datamine, OBI Project – PT. ANTAM, Tbk.

    In 2006

    • Introduction to Datamine for Divisi Perencanaan Tambang UBPE Pongkor, PT ANTAM, Tbk
    • Geological Modeling PT INCO, Tbk
    • Mining Data Processing PT. ANTAM Tbk,- Unit Geomin

    In 2005

    • Introduction to Datamine, PT. Aneka Tambang, Tbk -  Unit Geomin
    • Coal Modeling and Mine Design, PT. Tanjung Alam Jaya (TAJ)
    • Ore body Modeling (Nickel), PT. Aneka Tambang Tbk, -  Unit Geomin
    • Quarry Modeling PT. Semen Cibinong

    In 2004

    • Coal Modeling Course, PT. Lanna Harita dan Dinas Pertambangan PEMDA, West Kutai
    • On Job Training Coal Modeling , PT Singlurus Pratama
    • Coal Modeling and Mine Design, PT TIMAH 2005


Copyright © 2013, PT. STANIA BARA CONSULTING. All Rights Reserved.